 |
 |
 |
Location:
Stuart, FL
Built By:
PCL Civil Constructors, Inc.
|
|
 |
Project Description
This project involved the complete removal of the northbound and southbound two-lane, 11-span, 110-meter (360 feet) bridges across the Tomoka River in Ormond Beach, Florida. The replacement bridges utilized seven-span AASHTO Type II beams with a total span length of 107 meters at a slightly higher grade profile. The roadway reconstruction was approximately 540 meters (1770 feet) long for both northbound and southbound roadways.
|
Contact
For similar projects contact:
Owner
Prime ConsultantHNTB
|
 |