|
|
|
|
|||||||||||||||||||||||
Project Description
This project consisted of the installation of an electric driven blower, rework of an existing nitrogen turbine, and the installation of associated piping and electrical. These upgrades provide for an increase in liquid nitrogen production at the Praxair Air Separation Plant.
|
Contact
For similar projects contact:Owner |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |